PolyLevel prep
Port Holes are drilled into the slab to give the PolyLevel a means of reaching the bottom of the slab.
After Installation.
The slab is reconnected and the cracks are sealed.
Proudly serving San Francisco Bay Area & Central Valley AreaContractor License: 973851